RT W S over BR SECOND CR

S 36 T 44 N R 6 W · County 073, Missouri · Built 1940 · 1 Lanes · 337 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
9432
Year Built
1940
Length
6.8 m (22.3 ft)
Max Span
6.8 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
337
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$152,000
Total Project Cost
$228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.