BU 60 E over FLOOD RELIEF CHNL

S 36 T 25 N R 6 E · County 023, Missouri · Built 1978 · 2 Lanes · 4,066 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3066
Year Built
1978
Length
46.3 m (151.9 ft)
Max Span
8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
4,066
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.