BU 60 W over FLOOD RELIEF CHNL

S 36 T 25 N R 6 E · County 023, Missouri · Built 1993 · 2 Lanes · 4,439 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
3065
Year Built
1993
Length
69.2 m (227 ft)
Max Span
7.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,439
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.