LEXINGTON AVE over CHESTNUT TFWY
S 34 T 50 N R 33 W · County 095, Missouri · Built 1907 · 2 Lanes · 8,474 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
39.110947, -94.548203
This bridge is in worse condition than 95.4% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 119 years old.
Nearby Bridges
CLIFF DR over CHESTNUT TFWY
Built 1920
GLADSTONE BLVD over ANDERSON AVE
Built 1897
CHESTNUT TFWY over KCS RR GUINOTTE AVE
Built 1990
GUINOTTE RP over MONTGALL AVE
Built 1990
CHESTNUT AVE over KCS RR GUINOTTE AVE
Built 1990
CHESTNUT/GUINOTTE over FILL
Built 1955
RP IS29S TO INDEPE over IS 29
Built 2010
IS 29 S over CST GUINOTTE AVE CST
Built 1953
NE INDUST TFWY over RR TRACKS
Built 1969
PVT OVERPASS S over CST TRUMAN RD
Built 1959
Bridge Details
- Structure #
- 25391
- Year Built
- 1907
- Reconstructed
- 1965
- Length
- 117.7 m (386.2 ft)
- Max Span
- 19.8 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,474
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,643,000
- Total Project Cost
- $3,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.