CHESTNUT/GUINOTTE over FILL

S 34 T 50 N R 33 W · County 095, Missouri · Built 1955 · 4 Lanes · 5,804 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
25387
Year Built
1955
Reconstructed
1990
Length
58.8 m (192.9 ft)
Max Span
9.8 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
5,804
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.