MANCHESTER TFWY over RR YARD

S 10 T 50 N R 33 W · County 095, Missouri · Built 1958 · 4 Lanes · 9,054 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
25382
Year Built
1958
Reconstructed
2004
Length
693.4 m (2274.9 ft)
Max Span
57.9 m
Width
17.9 m (58.7 ft)
Lanes
4
Daily Traffic
9,054
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$25,769,000
Total Project Cost
$38,654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.