IS 435 N over CST FRONT ST

S 30 T 50 N R 32 W · County 095, Missouri · Built 1968 · 3 Lanes · 39,577 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1375
Year Built
1968
Reconstructed
1986
Length
49.1 m (161.1 ft)
Max Span
21.9 m
Width
16.1 m (52.8 ft)
Lanes
3
Daily Traffic
39,577
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.