IS 44 E over CST SOUTHWEST AVE

S 25 T 45 N R 6 E · County 510, Missouri · Built 1971 · 5 Lanes · 49,081 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2002
Year Built
1971
Length
50 m (164 ft)
Max Span
20.4 m
Width
25.1 m (82.3 ft)
Lanes
5
Daily Traffic
49,081
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.