HAMPTON AVE over RVR DES PERES UP RR BN

S 20 T 44 N R 6 E · County 510, Missouri · Built 1986 · 6 Lanes · 44,150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
12429
Year Built
1986
Length
258.5 m (848.1 ft)
Max Span
37.2 m
Width
26.8 m (87.9 ft)
Lanes
6
Daily Traffic
44,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$8,168,000
Total Project Cost
$12,253,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.