SULPHUR AVE over RVR DES PERES
S 2037 T 45 N R 7 E · County 510, Missouri · Built 1970 · 2 Lanes · 200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.621431, -90.286297
This bridge is in worse condition than 96.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 56 years old.
Nearby Bridges
HAMPTON AVE over RVR DES PERES UP RR BN
Built 1986
KNOX AVE over RVR DES PERES
Built 1991
IS 44 E over CST HAMPTON AVE
Built 1969
IS 44 W over CST HAMPTON AVE
Built 1969
SUBLETTE AVE over RVR DES PERES
Built 1987
IS 44 E over CST SUBLETTE AVE
Built 1969
IS 44 W over CST SUBLETTE AVE
Built 1969
MACKLIND AVE S over IS 44 IS 44
Built 1969
MACKLAND AVE over RVR DES PERES
Built 1926
EDWARDS ST S over IS 44 IS 44
Built 1972
Bridge Details
- Structure #
- 12435
- Year Built
- 1970
- Length
- 29 m (95.1 ft)
- Max Span
- 28.3 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $314,000
- Total Project Cost
- $472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.