RIDGE RD-124 over BIG CR

S 14 T 32 N R 3 E · County 093, Missouri · Built 1995 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
16534
Year Built
1995
Length
69.5 m (228 ft)
Max Span
23.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.