MO 49 S over UP RR BIG CR

S 35 T 32 N R 3 E · County 093, Missouri · Built 1945 · 2 Lanes · 1,237 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4495
Year Built
1945
Length
151.2 m (496.1 ft)
Max Span
32 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,237
Material
Concrete Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,027,000
Total Project Cost
$4,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.