NW 55TH RD over E DRYWOOD CR

S 28 T 33 N R 33 W · County 011, Missouri · Built 1930 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
16366
Year Built
1930
Reconstructed
1992
Length
17.1 m (56.1 ft)
Max Span
7.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$199,000
Total Project Cost
$298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.