NW 70TH RD over DRYWOOD CR

S 15 T 33 N R 33 W · County 011, Missouri · Built 1900 · 1 Lanes · 5 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
2
Critical
Substructure
4
Poor

Bridge Details

Structure #
15939
Year Built
1900
Length
22.9 m (75.1 ft)
Max Span
11.3 m
Width
3.5 m (11.5 ft)
Lanes
1
Daily Traffic
5
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$377,000
Total Project Cost
$566,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.