NE RIDGEWAY DR over UP RR

S 35 T 57 N R 27 W · County 025, Missouri · Built 1954 · 2 Lanes · 5 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
16274
Year Built
1954
Length
37.8 m (124 ft)
Max Span
6.1 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
5
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$570,000
Total Project Cost
$854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.