NE GOULD FARM RD over OTTER CR

S 11 T 56 N R 27 W · County 025, Missouri · Built 1994 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
21346
Year Built
1994
Length
37.5 m (123 ft)
Max Span
15.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.