IGUANA ST over RICHLAND CR
S 26 T 60 N R 15 W · County 121, Missouri · Built 1989 · 1 Lanes · 15 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.974672, -92.542022
This bridge is in worse condition than 54.3% of bridges in County 121. The average bridge in Missouri is 0 years old; this one is 37 years old.
Nearby Bridges
IGUANA ST over E FK CHARITON RVR
Built 1988
IMPERIAL AVE over RICHLAND CR
Built 2017
IRIS ST over E FK LTL CHARITON
Built 2019
IRIS ST over UNNAMED STR
Built 2003
HILTON AVE over RICHLAND CR
Built 1994
IRIS ST over LONG BR
Built 1994
IRIS ST over RICHLAND CR
Built 1994
IMPALA ST over E FK CHARITON RVR
Built 2015
HELIUM ST over RICHLAND CR
Built 2003
IMPALA ST over BR OF CHARITON RVR
Built 2000
Bridge Details
- Structure #
- 14343
- Year Built
- 1989
- Length
- 18.3 m (60 ft)
- Max Span
- 18 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.