IGUANA ST over E FK CHARITON RVR
S 26 T 60 N R 15 W · County 121, Missouri · Built 1988 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.977978, -92.535275
This bridge is in worse condition than 79% of bridges in County 121. The average bridge in Missouri is 0 years old; this one is 38 years old.
Nearby Bridges
IGUANA ST over RICHLAND CR
Built 1989
IRIS ST over E FK LTL CHARITON
Built 2019
IMPERIAL AVE over RICHLAND CR
Built 2017
IRIS ST over UNNAMED STR
Built 2003
IRIS ST over LONG BR
Built 1994
HILTON AVE over RICHLAND CR
Built 1994
IMPALA ST over E FK CHARITON RVR
Built 2015
IRIS ST over RICHLAND CR
Built 1994
HELIUM ST over RICHLAND CR
Built 2003
IMPALA ST over LONG BR
Built 1989
Bridge Details
- Structure #
- 14337
- Year Built
- 1988
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.4 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.