MORA RD over TRIB OF SPRING FK

S 2 T 43 N R 21 W · County 015, Missouri · Built 1950 · 1 Lanes · 30 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
13324
Year Built
1950
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
30
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$102,000
Total Project Cost
$153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.