SPRING FORK RD over SPG FK LK DRAIN DT

S 21 T 44 N R 21 W · County 159, Missouri · Built 2022 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
37147
Year Built
2022
Length
25.4 m (83.3 ft)
Max Span
24.3 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.