COUNTY RD 216 over DRAIN CANAL

S 24 T 36 N R 11 E · County 157, Missouri · Built 1955 · 1 Lanes · 15 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
13116
Year Built
1955
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
15
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$116,000
Total Project Cost
$174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.