TR 208 A over ROCK CREEK
TR 208A OVER ROCK TI · County 157, Illinois · Built 1901 · 1 Lanes · 10 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
37.838167, -89.702131
This bridge is in worse condition than 81.9% of bridges in County 157. The average bridge in Illinois is 0 years old; this one is 125 years old.
Nearby Bridges
ILL 3 over ROCK CREEK
Built 1932
TR-226A EBENEZER R over ROCK CREEK
Built 2002
IL 3-FAP 312 over DEGOGNIA CREEK
Built 2001
TR 198 over TRIBUTARY TO MARYS R
Built 1978
CH 5 - FAS 863 over Little Mill Creek
Built 2020
TR 329 over LITTLE MIL CREEK
Built 1980
RT E S over BOIS BRULE CR
Built 1958
RT C S over CINQUEHMS CR
Built 1961
COUNTY RD 216 over DRAIN CANAL
Built 1955
FAS 863 over MILL CREEK
Built 1960
Bridge Details
- Structure #
- 079425000000000
- Year Built
- 1901
- Length
- 14.6 m (47.9 ft)
- Max Span
- 7.2 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $130,320,000
- Total Project Cost
- $139,920,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.