BOLIVAR ST N over US 50 US 63

S 12 T 44 N R 12 W · County 051, Missouri · Built 1964 · 2 Lanes · 7,744 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
1180
Year Built
1964
Length
88.1 m (289 ft)
Max Span
13.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
7,744
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,270,000
Total Project Cost
$1,905,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.