US 54 W over BU 50

S 12 T 44 N R 12 W · County 051, Missouri · Built 1966 · 3 Lanes · 16,791 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1077
Year Built
1966
Reconstructed
1989
Length
45.7 m (149.9 ft)
Max Span
18.9 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
16,791
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$988,000
Total Project Cost
$1,482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.