PINE GROVE W over US 60

S 25 T 27 N R 10 W · County 091, Missouri · Built 1999 · 2 Lanes · 212 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
11778
Year Built
1999
Length
100.3 m (329.1 ft)
Max Span
41.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
212
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.