MO 137 S over CST FIRST ST BNSF RR
S 30 T 27 N R 9 W · County 091, Missouri · Built 1939 · 2 Lanes · 3,661 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
36.990833, -91.970056
This bridge is in worse condition than 99.5% of bridges in County 091. The average bridge in Missouri is 0 years old; this one is 87 years old.
Nearby Bridges
MO 137 S over E BR ELEVEN POINTS
Built 1939
MO 137 S over W BR ELEVEN POINTS
Built 1939
PINE GROVE RD over ELEVEN POINT RVR
Built 1998
PINE GROVE RD over ELEVEN POINT RVR
Built 1977
MO 76 E over US 60
Built 1999
DAVIS DR over BNSF RR
Built 2018
TENTH ST over ELEVEN POINT RVR
Built 2013
US 60 W over SMITH BR
Built 1922
BU 63 S over HORAK BR
Built 1936
JASON DR over ELEVEN POINT RVR
Built 1978
Bridge Details
- Structure #
- 5941
- Year Built
- 1939
- Reconstructed
- 2004
- Length
- 80.5 m (264.1 ft)
- Max Span
- 23 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,661
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,913,000
- Total Project Cost
- $2,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.