US 54 E over CST LINDEN DR

S 12 T 44 N R 12 W · County 051, Missouri · Built 1966 · 2 Lanes · 13,381 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1079
Year Built
1966
Length
51.2 m (168 ft)
Max Span
19.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
13,381
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$829,000
Total Project Cost
$1,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.