BAKER ROAD over DRAINAGE DITCH NO 31
SEC 15 T17N R 6W · County 151, Mississippi · Built 2015 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.314083, -90.816094
This bridge is in worse condition than 8.4% of bridges in County 151. The average bridge in Mississippi is 0 years old; this one is 11 years old.
Nearby Bridges
FAS 619 TRIBBETT over CANAL
Built 1958
BAKER ROAD over DRAINAGE DITCH NO 27
Built 1997
BAKER ROAD over DRAINAGE DITCH NO 32
Built 1985
FAS 619 TRIBBETT over CANAL
Built 1958
FAS 619 TRIBBETT over CANAL
Built 1958
MARTA PLANTATION over DRAINAGE DITCH NO 29
Built 1971
MARTA PLANTATION over CANAL 0930
Built 1998
WILMOT ROAD over BOGUE PHALIA
Built 1974
DEAN ROAD over SIX MILE BAYOU
Built 1975
FAS 1600 KENNEDY over BOGUE PHALIA
Built 1958
Bridge Details
- Structure #
- SA760000000A159
- Year Built
- 2015
- Length
- 21 m (68.9 ft)
- Max Span
- 9.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $326,000
- Total Project Cost
- $926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.