BAKER ROAD over DRAINAGE DITCH NO 27
SEC 10 T17N R 6W · County 151, Mississippi · Built 1997 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.328467, -90.816342
This bridge is in worse condition than 39.7% of bridges in County 151. The average bridge in Mississippi is 0 years old; this one is 29 years old.
Nearby Bridges
MARTA PLANTATION over DRAINAGE DITCH NO 29
Built 1971
BAKER ROAD over DRAINAGE DITCH NO 31
Built 2015
FAS 619 TRIBBETT over CANAL
Built 1958
FAS 619 TRIBBETT over CANAL
Built 1958
BAKER ROAD over DRAINAGE DITCH NO 32
Built 1985
FAS 619 TRIBBETT over CANAL
Built 1958
DEAN ROAD over SIX MILE BAYOU
Built 1975
MARTA PLANTATION over CANAL 0930
Built 1998
FAS 1600 KENNEDY over BOGUE PHALIA
Built 1958
WILMOT ROAD over BOGUE PHALIA
Built 1974
Bridge Details
- Structure #
- SA7600000000156
- Year Built
- 1997
- Length
- 26.5 m (86.9 ft)
- Max Span
- 10.7 m
- Width
- 5.9 m (19.4 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $80,000
- Total Project Cost
- $247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.