DANIEL LAKE ROAD over I 55

1.6 MI S I55S/I20W · County 049, Mississippi · Built 1962 · 1 Lanes · 7,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
510005502508970
Year Built
1962
Length
66.1 m (216.9 ft)
Max Span
21.3 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
7,400
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$782,000,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.