I 55 over HARDY CREEK

0.2 MI N DANIEL LAKE INT · County 049, Mississippi · Built 1956 · 11 Lanes · 71,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
110005502508990
Year Built
1956
Reconstructed
1959
Length
9.1 m (29.9 ft)
Max Span
7.9 m
Lanes
11
Daily Traffic
71,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$68,000,000
Total Project Cost
$268,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.