M 1064 over MIDTOWN GREENWAY
0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1916 · 1 Lanes · 1,670 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
44.950372, -93.248667
This bridge is in worse condition than 96% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 110 years old.
Nearby Bridges
M 1062 over MIDTOWN GREENWAY
Built 1916
CSAH 152 over MIDTOWN GREENWAY TRAIL
Built 2017
M 1893 over MIDTOWN GREENWAY
Built 1916
MSAS 160 over MIDTOWN GREENWAY
Built 1916
M 1505 over MIDTOWN GREENWAY
Built 1916
M 2322 over MIDTOWN GREENWAY
Built 1915
M 808 over MIDTOWN GREENWAY
Built 1915
M 804 over MIDTOWN GREENWAY
Built 1915
M 1058 over MIDTOWN GREENWAY
Built 1915
MN 55 over LAKE ST
Built 1996
Bridge Details
- Structure #
- L8923
- Year Built
- 1916
- Length
- 29 m (95.1 ft)
- Max Span
- 9.9 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 1
- Daily Traffic
- 1,670
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $735,000,000
- Total Project Cost
- $355,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.