M 1058 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1915 · 2 Lanes · 1,609 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
L8916
Year Built
1915
Length
28.8 m (94.5 ft)
Max Span
9.6 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
1,609
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$458,000,000
Total Project Cost
$310,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.