M 2298 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1915 · 2 Lanes · 3,772 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
L8915
Year Built
1915
Length
34.8 m (114.2 ft)
Max Span
9.6 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
3,772
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$577,000,000
Total Project Cost
$457,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.