T 124 over WATONWAN RIVER
1.0 MI N OF JCT CSAH 3 · County 033, Minnesota · Built 1973 · 2 Lanes · 20 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
44.006417, -94.89845
This bridge is in worse condition than 90% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 53 years old.
Nearby Bridges
T 75 over WATONWAN RIVER
Built 1983
CSAH 3 over WATONWAN RIVER
Built 2023
CSAH 8 over WATONWAN RIVER
Built 2009
CSAH 1 over WATONWAN RIVER
Built 2017
T 124 over STREAM
Built 1979
T 40 over WATONWAN RIVER
Built 1921
T 42 over TRIB TO BUTTERFIELD CRK
Built 1979
CR 124 over WATONWAN RIVER
Built 1941
T 62 over WATONWAN RIVER
Built 1996
T 50 over WATONWAN RIVER
Built 1977
Bridge Details
- Structure #
- L6800
- Year Built
- 1973
- Length
- 15.9 m (52.2 ft)
- Max Span
- 7.8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Wood or Timber
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $575,000,000
- Total Project Cost
- $600,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.