T 40 over WATONWAN RIVER

0.5 MI W OF JCT CSAH 1 · County 033, Minnesota · Built 1921 · 1 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

43.977092, -94.929464

This bridge is in worse condition than 73.3% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 105 years old.

Nearby Bridges

Bridge Details

Structure #
3278
Year Built
1921
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
5.9 m (19.4 ft)
Lanes
1
Daily Traffic
35
Material
Concrete
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000,000
Total Project Cost
$210,000,000