T 40 over WATONWAN RIVER
0.5 MI W OF JCT CSAH 1 · County 033, Minnesota · Built 1921 · 1 Lanes · 35 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.977092, -94.929464
This bridge is in worse condition than 73.3% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 105 years old.
Nearby Bridges
CSAH 1 over WATONWAN RIVER
Built 2017
T 50 over WATONWAN RIVER
Built 1977
T 62 over WATONWAN RIVER
Built 1996
T 125 over WATONWAN RIVER
Built 2024
CSAH 3 over WATONWAN RIVER
Built 2023
CSAH 29 over WATONWAN RIVER
Built 1939
CSAH 29 over MT LAKE OUTLET
Built 2007
T 62 over WATONWAN RIVER
Built 2004
T 124 over WATONWAN RIVER
Built 1973
CR 99 over WATONWAN RIVER
Built 1977
Bridge Details
- Structure #
- 3278
- Year Built
- 1921
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 5.9 m (19.4 ft)
- Lanes
- 1
- Daily Traffic
- 35
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $193,000,000
- Total Project Cost
- $210,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.