T 128 over STRAIGHT RIVER
0.6 MI S OF JCT CR55 · County 147, Minnesota · Built 1958 · 2 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
1
Imminent Failure
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 1 | Imminent Failure |
Location
43.898783, -93.195997
This bridge is in worse condition than 98.5% of bridges in County 147. The average bridge in Minnesota is 0 years old; this one is 68 years old.
Nearby Bridges
CR 155 over STREAM
Built 1995
T 130 over JUD DITCH # 2;BR #1 LAT#
Built 1985
T 353 over JUD DITCH # 2
Built 1975
CSAH 45 over JUD DITCH # 2
Built 2005
CSAH 45 over JUD DITCH # 2
Built 2005
MN 30 over DITCH
Built 1949
T 82 over STRAIGHT RIVER
Built 2013
T 131 over DITCH
Built 2012
T 138 over STRAIGHT RIVER
Built 2023
T 79 over DITCH
Built 1989
Bridge Details
- Structure #
- L5584
- Year Built
- 1958
- Length
- 11 m (36.1 ft)
- Max Span
- 10.4 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $106,000,000
- Total Project Cost
- $66,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.