MN 30 over DITCH

4.5 MI E OF JCT TH 35 · County 147, Minnesota · Built 1949 · 2 Lanes · 1,047 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6733
Year Built
1949
Length
12 m (39.4 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
1,047
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$198,000,000
Total Project Cost
$162,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.