MSAS 251 over I 35W
3.2 MI N OF JCT TH 62 · County 053, Minnesota · Built 1965 · 3 Lanes · 8,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.93775, -93.27455
This bridge is in worse condition than 45.5% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 61 years old.
Nearby Bridges
MSAS 249 over I 35W
Built 1965
I 35W over STORM SEWER
Built 2009
MSAS 253 over I 35W
Built 1961
I 35W over STORM SEWER
Built 2009
I 35W over E 31ST ST
Built 2019
I 35W over E 31ST ST
Built 2021
I 35W over E. LAKE ST
Built 2019
I 35W over E. LAKE ST
Built 2021
BRT over E LAKE ST
Built 2021
MSAS 260 over I 35W
Built 1964
Bridge Details
- Structure #
- 9620
- Year Built
- 1965
- Length
- 61.3 m (201.1 ft)
- Max Span
- 21.7 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 3
- Daily Traffic
- 8,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.