MSAS 253 over I 35W
3.0 MI N OF JCT TH 62 · County 053, Minnesota · Built 1961 · 2 Lanes · 4,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.934164, -93.274503
This bridge is in worse condition than 16.3% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 65 years old.
Nearby Bridges
I 35W over STORM SEWER
Built 2009
MSAS 251 over I 35W
Built 1965
MSAS 249 over I 35W
Built 1965
I 35W over STORM SEWER
Built 2009
MSAS 260 over I 35W
Built 1964
I 35W over E 31ST ST
Built 2019
I 35W over E 31ST ST
Built 2021
I 35W over E. LAKE ST
Built 2019
I 35W over E. LAKE ST
Built 2021
BRT over E LAKE ST
Built 2021
Bridge Details
- Structure #
- 9619
- Year Built
- 1961
- Reconstructed
- 2018
- Length
- 65.1 m (213.6 ft)
- Max Span
- 23.7 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.