MN 36 over Cleveland Avenue
0.2 MI E OF JCT TH 35W · County 123, Minnesota · Built 1963 · 3 Lanes · 44,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.010267, -93.186794
This bridge is in worse condition than 68% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 63 years old.
Nearby Bridges
MN 36 over Cleveland Avenue
Built 1963
MN 36 over I 35W
Built 1964
CON 1424 over I 35W NB
Built 1964
CSAH 24 over I 35W; W FRONTAGE RD
Built 1986
MN 36 over Fairview Avenue
Built 1969
MN 36 over Fairview Avenue
Built 1969
I 35W over ROSEGATE; BNSR RR
Built 2019
I 35W over ROSEGATE;RAILROAD
Built 2021
I 35W over COUNTY RD C
Built 2021
I 35W over CSAH 23
Built 2019
Bridge Details
- Structure #
- 9276
- Year Built
- 1963
- Reconstructed
- 2008
- Length
- 50.6 m (166 ft)
- Max Span
- 25 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 3
- Daily Traffic
- 44,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $339,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.