MN 36 over Fairview Avenue

0.5 MI W OF JCT TH 51 WB · County 123, Minnesota · Built 1969 · 3 Lanes · 44,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
62029
Year Built
1969
Reconstructed
2008
Length
61.4 m (201.4 ft)
Max Span
29.3 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
44,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.