US 2 over RED RIVER
AT N DAKOTA STATE LINE · County 119, Minnesota · Built 1963 · 4 Lanes · 15,475 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.933278, -97.037356
This bridge is in worse condition than 89.6% of bridges in County 119. The average bridge in Minnesota is 0 years old; this one is 63 years old.
Nearby Bridges
US HIGHWAY 2 over RED RIVER OF THE NORTH
Built 1963
US 2 over 4th ST NW
Built 1964
US 2B over RED RIVER
Built 1929
US 2 BUSINESS LOOP over RED RIVER OF THE NORTH
Built 1929
ND 297/DEMERS AVE over BNRR-CITY STREET
Built 1972
MSAS 113 over RED RIVER OF THE NORTH
Built 1967
MINNESOTA AVE over RED RIVER OF THE NORTH
Built 1967
MSAS 119 over RED LAKE RIVER
Built 1980
US HIGHWAY 81 over ENGLISH COULEE
Built 2003
US HIGHWAY 2 over ENGLISH COULEE
Built 1988
Bridge Details
- Structure #
- 9090
- Year Built
- 1963
- Reconstructed
- 2016
- Length
- 383.6 m (1258.5 ft)
- Max Span
- 85 m
- Width
- 20.5 m (67.3 ft)
- Lanes
- 4
- Daily Traffic
- 15,475
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $490,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.