US 2B over RED RIVER

AT N DAKOTA STATE LINE · County 119, Minnesota · Built 1929 · 2 Lanes · 13,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4700
Year Built
1929
Length
183.7 m (602.7 ft)
Max Span
85 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
13,400
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.