CSAH 19 over S FK WATONWAN RIVER
0.9 MI N OF JCT CSAH7 · County 165, Minnesota · Built 1918 · 2 Lanes · 180 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.883008, -94.739033
This bridge is in worse condition than 87.3% of bridges in County 165. The average bridge in Minnesota is 0 years old; this one is 108 years old.
Nearby Bridges
T 132 over S FK WATONWAN RIVER
Built 1981
T 139 over S FK WATONWAN RIVER
Built 1978
CSAH 7 over S FK WATONWAN RIVER
Built 1978
CSAH 5 over CREEK FROM SCHOOL LAKE
Built 1946
T 128 over S FK WATONWAN RIVER
Built 1995
CSAH 19 over ST JAMES CREEK
Built 1979
MN 4 over WATONWAN RIVER
Built 1941
CSAH 54 over S FK WATONWAN RIVER
Built 2020
T 120 over S FK WATONWAN RIVER
Built 1996
CSAH 9 over S FK WATONWAN RIVER
Built 1923
Bridge Details
- Structure #
- 90344
- Year Built
- 1918
- Length
- 12.8 m (42 ft)
- Max Span
- 11.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $159,000,000
- Total Project Cost
- $115,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.