CSAH 9 over S FK WATONWAN RIVER

0.3 MI S OF JCT CSAH 54 · County 091, Minnesota · Built 1923 · 2 Lanes · 85 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4074
Year Built
1923
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
85
Material
Concrete
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$127,000,000
Total Project Cost
$198,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.