MSAS 194 over TH 194 SB
AT JCT TH 35 · County 137, Minnesota · Built 1969 · 2 Lanes · 7,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.776464, -92.110208
This bridge is in worse condition than 84.2% of bridges in County 137. The average bridge in Minnesota is 0 years old; this one is 57 years old.
Nearby Bridges
MN 194 over UNSTABLE MATERIAL
Built 1970
MN 194 over UNSTABLE MATERIAL
Built 1970
I 35 over SL;LC RR; TH 194 NB
Built 1985
I 35 over SL;LC RR; TH 194 NB
Built 1985
MN 194 over SUPERIOR ST(MSAS171)
Built 1968
I 35 over UNSTABLE MATERIAL
Built 1970
CON 610 over FILL
Built 1985
CON 5785 over UNSTABLE MATERIAL
Built 1985
CON 5785 over FILL
Built 1985
MSAS 135 over I 35 ACCES;RR STS; RR
Built 1966
Bridge Details
- Structure #
- 69839
- Year Built
- 1969
- Length
- 95.9 m (314.6 ft)
- Max Span
- 39.6 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $216,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.