MSAS 194 over TH 194 SB

AT JCT TH 35 · County 137, Minnesota · Built 1969 · 2 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
69839
Year Built
1969
Length
95.9 m (314.6 ft)
Max Span
39.6 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
7,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$216,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.