I 35 over SL;LC RR; TH 194 NB

0.3 MI SW OF JCT 5TH AVE · County 137, Minnesota · Built 1985 · 2 Lanes · 14,756 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
69818N
Year Built
1985
Length
833.9 m (2735.9 ft)
Max Span
59.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
14,756
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.