I 35 over TH 19

AT THE JCT TH 19; I 35 · County 131, Minnesota · Built 2001 · 2 Lanes · 17,237 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 5 Fair

Location

44.471919, -93.292083

This bridge is in worse condition than 86% of bridges in County 131. The average bridge in Minnesota is 0 years old; this one is 25 years old.

Nearby Bridges

Bridge Details

Structure #
66826
Year Built
2001
Length
58.8 m (192.9 ft)
Max Span
28.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
17,237
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.