I 35 over TH 19

AT THE JCT TH 19; 35 · County 131, Minnesota · Built 2004 · 2 Lanes · 19,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

44.471928, -93.292419

This bridge is in worse condition than 86% of bridges in County 131. The average bridge in Minnesota is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
66825
Year Built
2004
Length
58.8 m (192.9 ft)
Max Span
28.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$952,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.